Full Refurbishment of Civic Hall and Wulfrun Hall for City of Wolverhampton Council. Procured via the Scape National Construction framework

Project Stats

Duration

weeks
2

Value

£ 0 m

Size

sq ft
0

Sector

Leisure

Project Story

Project Brief

Willmott Dixon Interiors has delivered the complex structural refurbishment of the iconic Grade II-listed Civic Hall and Wulfrun Hall in Wolverhampton city centre.

Project Solution

The team have delivered essential structural, engineering and electrical works as part of the full refurbishment of the building. They include the introduction of impressive new spectator galleries at the Civic Hall and Wulfrun Hall, which has increased the combined capacity of the venue to 5,000. Modifications have also been made to the height above the stage to the rear of the Civic Hall to attract bigger shows, while there is more comfortable seating, improved social spaces and a greater number of accessible viewing points.

In the region of 600 tonnes of new steelwork has been added to the building to support new seating areas, including c.1,300 separate pieces of rigging, bracing, rebar and secondary steels.New façade works have been delivered to all elevations of the Civic Hall, while a variety of original features have been retained and restored to their 1930’s condition, including feature terrazzo flooring in the main lobby.

Works included a partial demolition and strip out of the building, with new foundations and drainage installed within both Halls, as well as new plant and LV substation rooms.

The project was procured via the Scape National Construction framework. on behalf of the City of Wolverhampton Council and was delivered alongside a project team that included Faithful+Gould, Furness and Space and Place.

Project Outline

  • Increased capacity of the venue to 5,000.
  • New foundations and drainage installed within both halls, as well as new plant and LV substation rooms.
  • Delivered essential structural, engineering and electrical works to update the building.
  • Frequent discoveries within the building leading to necessary repairs.
  • Retained and restored original features.

Related News

Project Team

Consultant Team

Project Manager: Faithful + Gould
Architect: Space & Place
Quantity Surveyor: Faithful + Gould
Structural Engineer: Furness

Related Case Studies

Contact us

Like what you see? Want to work with our amazing team? Contact us today