Project Stats
Duration
Value
Size
Sector
Commercial
Project Story
Project Brief
We were proud to have been chosen by West Yorkshire Combined Authority to deliver the £4.6 m refurbishment of Leeds Bus Station.
The 36-week project has delivered a significant upgrade to the existing bus station, providing more modern facilities, a new retail unit and improved accessibility for passengers.
The refurbishment of Leeds Bus Station was procured through the Scape Major Works National Framework.
Project Solution
Works were carried out while the bus station, travel centre, retail units and the adjoining Nation Express Coach Station remained in operation, with a maximum of six bus bays taken out of use at any one time.
The project was delivered by a team including WSP as project manager; Enjoy Design Ltd as architect and principal designer; and Waterman Building Services as structural engineer.
Project Outline
The completed project delivered:
- The refurbishment of the station concourse, with contemporary, durable wall and floor finishes,
- Replacement lighting and roof ventilation,
- New passenger seating, and real time information displays and signage.
- The travel centre was refurbished and made open to the concourse, while the existing drivers’ accommodation was relocated.
- Externally, the entrance canopies were replaced with larger, more visually attractive canopies and signage.
- New wall cladding was installed to increase visibility of the station and a ramp and steps were added to the station’s York Street entrance.
![WDI_LEEDS_BUS_STATION_AUG2022 31](https://www.willmottdixoninteriors.co.uk/wp-content/uploads/elementor/thumbs/WDI_LEEDS_BUS_STATION_AUG2022-31-qtk19mib6f4l9nh4y4dczrogrsvlayl4ppmavruxco.jpg)
![WDI_LEEDS_BUS_STATION_AUG2022 22](https://www.willmottdixoninteriors.co.uk/wp-content/uploads/elementor/thumbs/WDI_LEEDS_BUS_STATION_AUG2022-22-qtk19lkgzl3ay1ii3lyqf9x06f0839hedkytehwbiw.jpg)
![WDI_LEEDS_BUS_STATION_AUG2022 52](https://www.willmottdixoninteriors.co.uk/wp-content/uploads/elementor/thumbs/WDI_LEEDS_BUS_STATION_AUG2022-52-qtk19lkgzl3ay1ii3lyqf9x06f0839hedkytehwbiw.jpg)
![WDI_LEEDS_BUS_STATION_AUG2022 44](https://www.willmottdixoninteriors.co.uk/wp-content/uploads/elementor/thumbs/WDI_LEEDS_BUS_STATION_AUG2022-44-qtk19mib6f4l9nh4y4dczrogrsvlayl4ppmavruxco.jpg)
![WDI_LEEDS_BUS_STATION_AUG2022 38](https://www.willmottdixoninteriors.co.uk/wp-content/uploads/elementor/thumbs/WDI_LEEDS_BUS_STATION_AUG2022-38-qtk19lkgzl3ay1ii3lyqf9x06f0839hedkytehwbiw.jpg)
![WDI_LEEDS_BUS_STATION_AUG2022 36](https://www.willmottdixoninteriors.co.uk/wp-content/uploads/elementor/thumbs/WDI_LEEDS_BUS_STATION_AUG2022-36-qtk19mib6f4l9nh4y4dczrogrsvlayl4ppmavruxco.jpg)
![WDI_LEEDS_BUS_STATION_AUG2022 33](https://www.willmottdixoninteriors.co.uk/wp-content/uploads/elementor/thumbs/WDI_LEEDS_BUS_STATION_AUG2022-33-qtk19mib6f4l9nh4y4dczrogrsvlayl4ppmavruxco.jpg)
Related News
Video Stories
Project Team
Consultant Team
Customer: West Yorkshire Combined Authority
Architect: Enjoy Design Ltd
Project Manager: WSP
Principal Designer: Enjoy Design Ltd
Structural Engineer: Waterman Building Services